Product Introduction
Product advantages
This product can improve the performance of steel: high carbon content (>98.5%) effectively increases the carbon content of molten steel, improves the strength, hardness and wear resistance of steel.
Low sulfur and nitrogen content can reduce inclusions, improve the purity of steel, and is suitable for high-end special steel production.
Reduce production costs: replace part of pig iron and scrap steel, reduce raw material costs (can increase the proportion of scrap steel by 20%-30%).
The product has a high absorption rate, high absorption rate (>90%) and rapid melting to shorten smelting time and reduce energy consumption.
Low nitrogen content avoids the phenomenon of "nitrogen embrittlement" in molten steel and improves the toughness of steel.
Flexible application, customizable particle size (0-50mm), suitable for different smelting processes (such as electric furnaces, converters, refining furnaces).
Applicable to a variety of scenarios, such as cast iron, cast steel, alloy steel, etc., to improve the graphitization degree and density of castings.
Product Parameter(Specification)
|
Item |
Fixed Carbon |
Sulfur |
Ash |
Volatile Matter |
Nitrogen |
Moisture |
|
ZC-GPC-01 |
98.5 |
0.03 |
0.7 |
0.8 |
200ppm |
0.5 |
|
ZC-GPC-02 |
98.5 |
0.05 |
0.7 |
0.8 |
300ppm |
0.5 |
|
ZC-GPC-03 |
98 |
0.05 |
1.0 |
1.0 |
300ppm |
0.5 |
|
ZC-GPC-04 |
98.5 |
0.3 |
0.7 |
0.8 |
500ppm |
0.5 |
|
ZC-GPC-05 |
98 |
0.5 |
0.7 |
1.0 |
500ppm |
0.5 |
|
Size:0-0.2mm,0.2-1mm,1-5mm,5-10mm or according to your requirement |
||||||

Packaging & Shipping
Packing Details:
25kg small bags into one jumbo bag or 1mt jumbo bag or according to customers' requirements
Port: Tianjin Port, Qingdao Port
Leading Time: Shipped in 15-30 days after payment

Product Qualification

Deliver,shipping and serving
1. We prefer payment through T/T, L/C, D/P; Western Union and Paypal are also workable.
2. By courier, like DHL, UPS, FedEx. That is door to door, usually, 5-7 days to arrive.
By air transport, usually, 3-4 days to arrive.
By sea transport, usually, 15-30 days to arrive.
If your delivery time is urgent, we recommend you choose express or air freight. This applies to samples or small batches of goods.
If your delivery time is not very urgent, we recommend you choose sea transportation, it is very cheap.
Hot Tags: graphitized petroleum coke for steel metallurgy, China graphitized petroleum coke for steel metallurgy manufacturers, suppliers, factory, graphitized petroleum coke thermal conductivity, graphitized petroleum coke long lasting graphitized petroleum coke, graphitized petroleum coke supply, graphitized petroleum coke for foundry, graphitized petroleum coke productivity, graphite petroleum coke pricing










